Data Centers are... 
um... 
POWER HUNGRY!

That's okay. There is such
a thing as a gigawatt.
We build them at LSG.

Dollars & Cents

10 MW

Your Facility Size

$14,400,000

Annual Electric Bill

$12,000,000

Annual Savings with LSG

100 MW

Facility Size

$144,000,000

Annual Electric Bill

$120,000,000

Annual Savings with LSG

A gigawatt is just 10 100MW LSGs tied together

Wind. Solar Panels. They'll tell a large data center the same thing, "We can't generate as much power as you use." Heh heh. Amateurs. A 100MW LSG is off-the-shelf. 10 of them gives you a gigawatt. Tying them together is easy. Just don't ask us to build your switchgear. Leave that to our partners at Raptor Power Systems.

For all the fun we're having here, here's the reality. LSG can supply your power for cheaper than hydro and as stably as if you were on the grid. See all the details by reading the white paper below.

We need your consent to load the translations

We use a third-party service to translate the website content that may collect data about your activity. Please review the details in the privacy policy and accept the service to view the translations.